MAJOR PROJECTS IMPLEMENTED

IN  LAST 5 YEARS

 

HAZARDOUS CHEMICAL STORAGE &

 HARBOUR TERMINALS

 

Sr.No.

Cat No.

 

             Client/Location

 

Total Project Cost

In Million

Rs. / (USD)

Brief

Description

of Project

 

Scope of

Services

Rendered

 

Status

1.

6

Sagar Construction for ONGC, Hazira 20/ (0.4)

 

Large API 650 Petroleum Storage Tanks DE - C, M, P, E, I  Ongoing

2.

6

Perfochem India Pvt. Ltd., Mumbai 60/ (1.3) TEFR for Bulk Storage and Retailing in Refill Cylinders for Hazardous chemicals. BE & TEFR as acceptable to financial institutions On going

3.

˜

6

Colombo Dockyard Ltd., Colombo,       

Sri Lanka.

160 (4)

 

Jet Aviation Fuel Bulk Storage Tankfarm and Pumping System

Petroleum Class “B” Products are directly pumped from ship by long pipelines stored in bulk tanks and despatched in tanker loads.

Assistance in Design, Cost Estimation for Tender Preparation for the Project to be set up in Male, Maldives.

 
Completed 1999
4.

6

Friends Oil  & Chemical Terminals Pvt. Ltd., Kandla, (Gujarat)

 

1700(42.5)

48,000 KL Storage Tankfarm and Pumping facility for Petroleum Class A Products. BE, DE-C/M/P/E/I, PR, TN, INS, EXP, CON, COM & PMC for total Project Implementation Completed  1998

 

˜ Multiple Projects for same Client

Abbreviations:

BE Basic Engg.

P

Piping

E

Electrical

EXP

Third Party Expediting

DE

Detailed Engg.

I

Instrumentation

CON

Construction, Supervision

INS

Third Party Inspection

C

Civil

PR

Procurement

PMC

Project Management

EPC

Engg, Procurement, Construction Supervision

M

Mechanical

TN

Training

COM

Commissioning

 

Home