MAJOR PROJECTS IMPLEMENTED
IN LAST 5 YEARS
|
HAZARDOUS CHEMICAL STORAGE & HARBOUR TERMINALS |
|
Sr.No. Cat No.
|
Client/Location
|
Rs. / (USD) |
Brief Description of Project
|
Scope of Services Rendered
|
Status |
|
|
1. 6 |
Sagar Construction for ONGC, Hazira | 20/
(0.4)
|
Large API 650 Petroleum Storage Tanks | DE - C, M, P, E, I | Ongoing | |
|
2. 6 |
Perfochem India Pvt. Ltd., Mumbai | 60/ (1.3) | TEFR for Bulk Storage and Retailing in Refill Cylinders for Hazardous chemicals. | BE & TEFR as acceptable to financial institutions | On going | |
|
3. ˜ 6 |
Colombo
Dockyard Ltd., Colombo,
Sri Lanka. |
160 (4) |
Jet Aviation Fuel
Bulk Storage Tankfarm and Pumping System Petroleum Class “B” Products are directly pumped from ship by long pipelines stored in bulk tanks and despatched in tanker loads. |
Assistance in Design, Cost Estimation for Tender Preparation for the Project to be set up in Male, Maldives. |
Completed 1999 | |
| 4.
6 |
Friends
Oil & Chemical Terminals
Pvt. Ltd., Kandla, (Gujarat) |
1700(42.5) |
48,000 KL Storage Tankfarm and Pumping facility for Petroleum Class A Products. | BE, DE-C/M/P/E/I, PR, TN, INS, EXP, CON, COM & PMC for total Project Implementation | Completed
1998
|
˜ Multiple Projects for same Client
Abbreviations:
| BE | Basic Engg. |
P |
Piping |
E |
Electrical |
EXP |
Third Party Expediting |
| DE |
Detailed Engg. |
I |
Instrumentation |
CON |
Construction, Supervision |
INS |
Third Party Inspection |
| C |
Civil |
PR |
Procurement |
PMC |
Project Management |
EPC |
Engg, Procurement, Construction Supervision |
| M |
Mechanical |
TN |
Training |
COM |
Commissioning |