MAJOR PROJECTS IMPLEMENTED
IN LAST 5 YEARS
|
ENGINEERING ,POWER PLANT & ASSORTED PROJECTS |
|
Sr.No. Cat No.
|
Client/Location
|
Rs. / (USD) |
Brief Description of Project
|
Scope of Services Rendered
|
Status |
|
|
1. 8 |
Nicomet Inds. Ltd., Goa |
135/
(3.0)
|
Study of existing
plant, identification of problem areas, suggestions and design for
improvements |
TPM Design & Implementation and Process Improvements |
Completed. 2001 |
|
|
2. 8 |
Atlas Gears, Belgaum
|
-- | Maintenance System for Heavy Engg. Unit, having large M/C tools, Gear Hobbers, Foundry, Heat Treatment etc. | Computerized TPM Design & Implementation |
Completed
2002 |
|
|
3.
8 |
Chemtrol
Engineering Ltd., Mumbai |
100
/ (2.25)
|
Study of Existing
captive power plant of 10 MW, Assessment of feasibility to restart and
cost economics
|
Plant Audit and
report
|
Completed 2002 |
|
|
4.
8 |
MaridiEcotherm Systems, Mumbai |
20/ (0.5) |
Waste Heat Recovery Systems for GSFC | DE, E | Completed 2000 | |
|
5.
8 |
M/s.
Neo Power Electronics & Projects Pvt. Ltd, Mumbai
|
80/
(1.8) |
Pollution Control
System for Indian Navy including Regenerative Thermal Oxidiser (RTO) |
Design Validation, C, M, P, E, I, INS |
Completed
1999 |
˜ Multiple Projects for same Client
Abbreviations:
| BE | Basic Engg. |
P |
Piping |
E |
Electrical |
EXP |
Third Party Expediting |
| DE |
Detailed Engg. |
I |
Instrumentation |
CON |
Construction, Supervision |
INS |
Third Party Inspection |
| C |
Civil |
PR |
Procurement |
PMC |
Project Management |
EPC |
Engg, Procurement, Construction Supervision |
| M |
Mechanical |
TN |
Training |
COM |
Commissioning |